chargevu
0 of 2 available3.7 kW peakChargePoint

ASPEN BLOOMINGT 9

703 West Gourley Pike, Bloomington, US

2 ports

Ports at this station

  • Type 1 (J1772)

    2× · up to 3.7 kW

    Unknown

Station info

Address
703 West Gourley Pike, 47404, Bloomington, IN, United States
Access
24 hours daily
Coordinates
39.18394, -86.54136
Last verified
2025-06-24

About this stop

This ChargePoint station at Aspen Bloomingt 9 in Bloomington, US is best suited for drivers needing a slower AC charge. It offers Type 1 (J1772) connectors. The peak power output is 4 kW, which means it adds about 10-15 miles of range per hour of charging.

Expect this station to function as a local top-up point rather than a rapid refueling stop for cross-country trips. A 4 kW charging speed is considerably slower than DC fast chargers, which can deliver 50 kW or more. For context, charging a typical EV battery from empty to full at 4 kW could take well over 24 hours. EV charging in Bloomington includes options like this for everyday use. The station is reported as operational.

Nearby

6 closest stations

If this site is busy or out of service, here are the next best options within roughly 50 km.

Reviews

No reviews yet. Be the first to tell other drivers what to expect.

Anonymous review

Tell other drivers what happened at ASPEN BLOOMINGT 9.

No account. No email harvested. Captcha is used to keep spammers out.

By submitting you confirm this is your own experience. We rate-limit 1 review per IP per station per 24 hours.

Quick check-in

1 tap · rate-limited

Tell the next driver what to expect.

Photo

Add a photo of ASPEN BLOOMINGT 9.

JPEG, PNG, WebP or HEIC, 5 MB max. EXIF is stripped on our side. Photos appear after a quick moderation pass.

Drag a photo here, or click to pick one.

JPEG, PNG, WebP, HEIC up to 5 MB