chargevu
0 of 2 available22 kW peakIndependent

Ayuntamiento Castellote

Calle Minas 5, Castellote, ES

2 ports

Ports at this station

  • CCS2

    2× · up to 22 kW

    Unknown

Station info

Address
Calle Minas 5, Castellote, Teruel, Spain
Total points
2
Coordinates
40.79908, -0.31715
Last verified
2025-01-23

About this stop

This 22 kW AC charging station is for EV drivers needing a slower charge. It offers two CCS connectors. The Ayuntamiento Castellote is listed as the operator, though it is not part of a larger network. This charging point is planned for future activation, so it is not yet available for use. EV charging in Castellote will expand with this addition once it goes live.

Expect a charge rate of up to 22 kW. This means adding about 60-80 miles of range per hour to a compatible EV, depending on the vehicle's onboard charger and battery. It is best suited for local top-ups or longer stops rather than quick road-trip charging. The station currently has a status of 'Planned For Future Date'.

Nearby

6 closest stations

If this site is busy or out of service, here are the next best options within roughly 50 km.

Reviews

No reviews yet. Be the first to tell other drivers what to expect.

Anonymous review

Tell other drivers what happened at Ayuntamiento Castellote.

No account. No email harvested. Captcha is used to keep spammers out.

By submitting you confirm this is your own experience. We rate-limit 1 review per IP per station per 24 hours.

Quick check-in

1 tap · rate-limited

Tell the next driver what to expect.

Photo

Add a photo of Ayuntamiento Castellote.

JPEG, PNG, WebP or HEIC, 5 MB max. EXIF is stripped on our side. Photos appear after a quick moderation pass.

Drag a photo here, or click to pick one.

JPEG, PNG, WebP, HEIC up to 5 MB