chargevu
3 of 4 available100 kW peakBC Hydro

BC Hydro - Canada Post

70 Mile Frontage Road, 70 Mile House, CA

4 ports · 50 kW $0.2113/minute + GST... 100 kW $0.2717/minute + GST

Ports at this station

  • CHAdeMO

    1× · up to 50 kW

    Unknown
  • CCS1

    1× · up to 50 kW

    Available
  • CHAdeMO

    1× · up to 100 kW

    Available
  • CCS1

    1× · up to 100 kW

    Available

Station info

Address
70 Mile Frontage Road, V0K 2K0, 70 Mile House, Thompson-Nicola Regional District, Canada
Access
BC Hydro dual-standard fast charger (one vehicle at a time) located in parking area to north of Canada Post office off Cariboo Highway. Flo DCFC can be activated by the BC Hydro EV app and can't be activated by Greenlots Card/App. Snacks and deli (to 3 p.m.) at 70 Mile General Store (6 am-7 pm, M-F, 9 am-7 pm weekends), breakfast/lunch at Corral Restaurant (7 a.m.-3 p.m.) and lunch/dinner at Dusty Rose Neighbourhood Pub (open at noon).
Total points
1
Coordinates
51.30476, -121.39707
Last verified
2024-02-26

About this stop

This BC Hydro charging station is located at the Canada Post office in 70 Mile House, British Columbia. It offers one rapid charging point with a peak output of 100 kW. The station is operational and equipped with both CCS (Type 1) and CHAdeMO connectors.

For EV charging in 70 Mile House, this station functions as a quick stop. A 100 kW peak means you could add approximately 100 miles of range in about 20 to 30 minutes, depending on your vehicle's charging capability. Charging costs $0.2113 per minute for speeds up to 50 kW and $0.2717 per minute for speeds up to 100 kW, not including GST.

Nearby

5 closest stations

If this site is busy or out of service, here are the next best options within roughly 50 km.

Reviews

No reviews yet. Be the first to tell other drivers what to expect.

Anonymous review

Tell other drivers what happened at BC Hydro - Canada Post.

No account. No email harvested. Captcha is used to keep spammers out.

By submitting you confirm this is your own experience. We rate-limit 1 review per IP per station per 24 hours.

Quick check-in

1 tap · rate-limited

Tell the next driver what to expect.

Photo

Add a photo of BC Hydro - Canada Post.

JPEG, PNG, WebP or HEIC, 5 MB max. EXIF is stripped on our side. Photos appear after a quick moderation pass.

Drag a photo here, or click to pick one.

JPEG, PNG, WebP, HEIC up to 5 MB