Bossoni Audi
Strada Provinciale 415 Paullese, Cremona, IT
2 ports
Ports at this station
- Available
CCS2
2× · up to 150 kW
Station info
- Address
- Strada Provinciale 415 Paullese, 26100, Cremona, Lombardy, Italy
- Access
- Verificare orari apertura
- Total points
- 1
- Coordinates
- 45.15717, 9.98939
- Last verified
- 2023-09-23
About this stop
This station offers one CCS (Type 2) connector, suitable for most modern EVs. It provides 150 kW peak power, which is considered ultra-rapid. The operator is listed as independent or unlisted. This is one option for EV charging in Cremona.
A 150 kW peak charging rate means you can add roughly 100 miles of range to a compatible EV in under 20 minutes, depending on the vehicle. This station is best suited for a quick top-up rather than a full recharge on a long journey. It is currently reported as operational.
6 closest stations
If this site is busy or out of service, here are the next best options within roughly 50 km.
Viride Distributore Eni
37.6 kmSalsomaggiore Terme
3 kW
Viride Eni
37.6 kmSalsomaggiore Terme
22 kW
Stazione Salsomaggiore Terme | EnelX
37.7 kmSalsomaggiore Terme
22 kW
Be Charge McDonald's
37.8 kmSalsomaggiore Terme
150 kW
Salsomaggiore Area Mercatale | EnelX
38.0 kmSalsomaggiore Terme
22 kW
Salsomaggiore Parco Corazza | EnelX
38.0 kmSalsomaggiore Terme
22 kW
No reviews yet. Be the first to tell other drivers what to expect.
Quick check-in
1 tap · rate-limited
Tell the next driver what to expect.
Add a photo of Bossoni Audi.
JPEG, PNG, WebP or HEIC, 5 MB max. EXIF is stripped on our side. Photos appear after a quick moderation pass.
Drag a photo here, or click to pick one.
JPEG, PNG, WebP, HEIC up to 5 MB