BP Pulse Torrelavega 7 San Fernado
Avenida de Martin Luther King, San Fernando de Henares, ES
2 ports · 0.59€/kWh
Ports at this station
- Available
CCS2
2× · up to 150 kW
Station info
- Address
- Avenida de Martin Luther King, 28830, San Fernando de Henares, Comunidad de Madrid, Spain
- Total points
- 2
- Coordinates
- 40.41278, -3.52109
- Last verified
- 2023-09-02
About this stop
BP Pulse Torrelavega 7 San Fernado is located in San Fernando De Henares, Spain. This Iberdrola-operated site offers 2 charging points, each capable of 150 kW peak ultra-rapid charging. The connectors available are CCS (Type 2). The station is currently reported as operational. EV charging in San Fernando De Henares is supported by this location, with a cost of 0.59€ per kWh.
With 150 kW peak power, you can add approximately 100 miles of range in under 20 minutes, depending on your vehicle's charging speed. This makes it a viable option for quick top-ups if you are local, or for extending your range on longer journeys. Drivers should note that 150 kW is the maximum output, and actual speeds will vary based on your car and the station's load.
6 closest stations
If this site is busy or out of service, here are the next best options within roughly 50 km.
No reviews yet. Be the first to tell other drivers what to expect.
Quick check-in
1 tap · rate-limited
Tell the next driver what to expect.
Add a photo of BP Pulse Torrelavega 7 San Fernado.
JPEG, PNG, WebP or HEIC, 5 MB max. EXIF is stripped on our side. Photos appear after a quick moderation pass.
Drag a photo here, or click to pick one.
JPEG, PNG, WebP, HEIC up to 5 MB