chargevu
0 of 2 available50 kW peakChargePoint

BRUCEGROUP GM-L3-1

394 Main Street, Middleton, CA

2 ports

Ports at this station

  • CHAdeMO

    1× · up to 50 kW

    Unknown
  • CCS1

    1× · up to 50 kW

    Unknown

Station info

Address
394 Main Street, B0S 1P0, Middleton, NS, Canada
Access
24 hours daily
Coordinates
44.94394, -65.06500
Last verified
2025-11-11

About this stop

The BRUCEGROUP GM-L3-1 station in Middleton, California is operated by ChargePoint. It provides rapid charging with a peak power of 50 kW. The station offers CCS (Type 1) and CHAdeMO connectors for electric vehicles. This is one of the EV charging options in Middleton.

A 50 kW peak charging rate means most EVs can add about 150 miles of range in an hour. This station is best suited for a quick top-up on a local drive rather than a long road trip stop. Its operational status means it is currently available for use.

Nearby

6 closest stations

If this site is busy or out of service, here are the next best options within roughly 50 km.

Reviews

No reviews yet. Be the first to tell other drivers what to expect.

Anonymous review

Tell other drivers what happened at BRUCEGROUP GM-L3-1.

No account. No email harvested. Captcha is used to keep spammers out.

By submitting you confirm this is your own experience. We rate-limit 1 review per IP per station per 24 hours.

Quick check-in

1 tap · rate-limited

Tell the next driver what to expect.

Photo

Add a photo of BRUCEGROUP GM-L3-1.

JPEG, PNG, WebP or HEIC, 5 MB max. EXIF is stripped on our side. Photos appear after a quick moderation pass.

Drag a photo here, or click to pick one.

JPEG, PNG, WebP, HEIC up to 5 MB