Camilletti Impianti
Via Filello 4, Loreto, IT
2 ports
Ports at this station
- Unknown
CCS2
1× · up to 50 kW
- Unknown
CHAdeMO
1× · up to 50 kW
Station info
- Address
- Via Filello 4, Loreto, AN, Italy
- Total points
- 2
- Website
- forumelettrico.it/forum/colonnina-fast-loreto-via-filello-zona-dietro-c-c-loretocenter-t20983.html
- Coordinates
- 43.43785, 13.62539
- Last verified
- 2022-06-07
About this stop
Camilletti Impianti is an independent EV charging site in Loreto, Italy. It offers two charging points with CCS (Type 2) and CHAdeMO connectors. The maximum power output at this location is 50 kW, which is considered rapid charging. The station is currently operational.
This station can provide a decent charge for drivers needing EV charging in Loreto. A 50 kW peak output means it can add around 100 miles of range to a compatible EV in about an hour, depending on the vehicle. This makes it a useful stop for topping up or for longer journeys, though it is not a ultra-fast charger.
6 closest stations
If this site is busy or out of service, here are the next best options within roughly 50 km.
No reviews yet. Be the first to tell other drivers what to expect.
Quick check-in
1 tap · rate-limited
Tell the next driver what to expect.
Add a photo of Camilletti Impianti.
JPEG, PNG, WebP or HEIC, 5 MB max. EXIF is stripped on our side. Photos appear after a quick moderation pass.
Drag a photo here, or click to pick one.
JPEG, PNG, WebP, HEIC up to 5 MB