Castillejo de Iniesta (Zunder)
Cepsa, Castillejo de Iniesta, ES
6 ports · 0.65€/kWh
Ports at this station
- Available
CCS2
2× · up to 180 kW
- Available
CCS2
2× · up to 360 kW
- Available
CCS2
2× · up to 360 kW
Station info
- Address
- Cepsa, Castillejo de Iniesta, Castile-La Mancha, Spain
- Total points
- 6
- Coordinates
- 39.51680, -1.75345
- Last verified
- 2026-07-05
About this stop
Zunder operates this ultra-rapid EV charging station in Castillejo De Iniesta. It has six charging points, all equipped with CCS (Type 2) connectors. The maximum output here is 360 kW per point. EV charging in Castillejo De Iniesta is handled by this Zunder facility.
This station is built for rapid charging. A 360 kW peak rate means adding around 200 miles of range to a compatible EV in under 20 minutes. It’s a practical stop for drivers covering longer distances. The reported cost is 0.65€ per kilowatt-hour. The station is currently operational.
6 closest stations
If this site is busy or out of service, here are the next best options within roughly 50 km.
No reviews yet. Be the first to tell other drivers what to expect.
Quick check-in
1 tap · rate-limited
Tell the next driver what to expect.
Add a photo of Castillejo de Iniesta (Zunder).
JPEG, PNG, WebP or HEIC, 5 MB max. EXIF is stripped on our side. Photos appear after a quick moderation pass.
Drag a photo here, or click to pick one.
JPEG, PNG, WebP, HEIC up to 5 MB