chargevu
0 of 2 available50 kW peakChargePoint

CHARGE STATION STATION 2

Plains at Brant, Burlington, CA

2 ports

Ports at this station

  • CHAdeMO

    1× · up to 50 kW

    Unknown
  • CCS1

    1× · up to 50 kW

    Unknown

Station info

Address
Plains at Brant, L7R 5B3, Burlington, ON, Canada
Access
24 hours daily
Coordinates
43.33831, -79.81669
Last verified
2025-11-11

About this stop

CHARGE STATION STATION 2 is located in Burlington, California. This ChargePoint-operated site offers rapid charging up to 50 kW. Drivers can connect using CCS (Type 1) or CHAdeMO connectors. The status is reported as operational.

With a peak power of 50 kW, this station is best suited for quick top-ups rather than full road trip charges, though it will add about 150 miles of range to a typical EV in an hour. It provides a reliable option for EV charging in Burlington. The number of charging points on site is not specified.

Nearby

6 closest stations

If this site is busy or out of service, here are the next best options within roughly 50 km.

Reviews

No reviews yet. Be the first to tell other drivers what to expect.

Anonymous review

Tell other drivers what happened at CHARGE STATION STATION 2.

No account. No email harvested. Captcha is used to keep spammers out.

By submitting you confirm this is your own experience. We rate-limit 1 review per IP per station per 24 hours.

Quick check-in

1 tap · rate-limited

Tell the next driver what to expect.

Photo

Add a photo of CHARGE STATION STATION 2.

JPEG, PNG, WebP or HEIC, 5 MB max. EXIF is stripped on our side. Photos appear after a quick moderation pass.

Drag a photo here, or click to pick one.

JPEG, PNG, WebP, HEIC up to 5 MB