chargevu
2 of 2 available120 kW peakPLN (Indonesia)

Cherry Trimegah Bekasi

Cherry Trimegah Bekasi, , Jl Siliwangi, Bekasi, ID

2 ports · IDR 2467/kWh ++

Ports at this station

  • CCS2

    2× · up to 120 kW

    Available

Station info

Address
Cherry Trimegah Bekasi, , Jl Siliwangi, 17114, Bekasi, Jawa Barat, Indonesia
Total points
1
Coordinates
-6.26405, 106.99557
Last verified
2026-05-28

About this stop

This station offers CCS (Type 2) charging, compatible with most European EVs sold globally. Cherry Trimegah Bekasi is operated by PLN and provides 120 kW peak power from a single charging point. It is currently operational.

A 120 kW peak charge rate can add about 200 miles of range to a compatible EV in 30 minutes. This station is better suited for a quick top-up than a lengthy road trip stop. EV charging in Bekasi is growing. The cost is IDR 2467 per kilowatt-hour, plus potential fees.

Nearby

5 closest stations

If this site is busy or out of service, here are the next best options within roughly 50 km.

Reviews

No reviews yet. Be the first to tell other drivers what to expect.

Anonymous review

Tell other drivers what happened at Cherry Trimegah Bekasi.

No account. No email harvested. Captcha is used to keep spammers out.

By submitting you confirm this is your own experience. We rate-limit 1 review per IP per station per 24 hours.

Quick check-in

1 tap · rate-limited

Tell the next driver what to expect.

Photo

Add a photo of Cherry Trimegah Bekasi.

JPEG, PNG, WebP or HEIC, 5 MB max. EXIF is stripped on our side. Photos appear after a quick moderation pass.

Drag a photo here, or click to pick one.

JPEG, PNG, WebP, HEIC up to 5 MB