chargevu
0 of 2 available50 kW peakChargePoint

CHEVRON JQ JENSEN DC 2

2885 E Jensen Ave, Fresno, US

2 ports

Ports at this station

  • CHAdeMO

    1× · up to 50 kW

    Unknown
  • CCS1

    1× · up to 50 kW

    Unknown

Station info

Address
2885 E Jensen Ave, 93706, Fresno, CA, United States
Access
24 hours daily
Coordinates
36.70754, -119.77660
Last verified
2025-11-11

About this stop

ChargePoint operates the CHEVRON JQ JENSEN DC 2 station in Fresno. This site offers rapid charging with a peak output of 50 kW. The station is equipped with both CCS (Type 1) and CHAdeMO connectors, and its current status is reported as operational.

A 50 kW peak power output means you can add roughly 100 miles of range to a typical EV in about 40 minutes, depending on the vehicle and battery temperature. This makes the station a viable option for EV charging in Fresno, suitable for quick top-ups or longer road trip stops. The number of charging points at the location is not specified.

Nearby

6 closest stations

If this site is busy or out of service, here are the next best options within roughly 50 km.

Reviews

No reviews yet. Be the first to tell other drivers what to expect.

Anonymous review

Tell other drivers what happened at CHEVRON JQ JENSEN DC 2.

No account. No email harvested. Captcha is used to keep spammers out.

By submitting you confirm this is your own experience. We rate-limit 1 review per IP per station per 24 hours.

Quick check-in

1 tap · rate-limited

Tell the next driver what to expect.

Photo

Add a photo of CHEVRON JQ JENSEN DC 2.

JPEG, PNG, WebP or HEIC, 5 MB max. EXIF is stripped on our side. Photos appear after a quick moderation pass.

Drag a photo here, or click to pick one.

JPEG, PNG, WebP, HEIC up to 5 MB