chargevu
0 of 2 available50 kW peakEVGateway

City of Sheridan

4101 S Federal Blvd, Sheridan, US

2 ports

Ports at this station

  • CHAdeMO

    1× · up to 50 kW

    Unknown
  • CCS1

    1× · up to 50 kW

    Unknown

Station info

Address
4101 S Federal Blvd, 80110, Sheridan, CO, United States
Access
24 hours daily
Coordinates
39.64187, -105.02678
Last verified
2025-11-11

About this stop

This City of Sheridan charging station accommodates CCS (Type 1) and CHAdeMO connectors, suitable for most modern electric vehicles. It is operated by EVGateway and is currently operational. The station offers rapid charging with a peak power output of 50 kW.

For EV charging in Sheridan, this station is a practical option for quick top-ups. A 50 kW peak charging rate means adding roughly 20 to 25 miles of range per hour of charging, depending on the vehicle. This makes it a useful stop for local drivers or those needing a moderate charge rather than a full battery refill on a longer journey.

Nearby

6 closest stations

If this site is busy or out of service, here are the next best options within roughly 50 km.

Reviews

No reviews yet. Be the first to tell other drivers what to expect.

Anonymous review

Tell other drivers what happened at City of Sheridan.

No account. No email harvested. Captcha is used to keep spammers out.

By submitting you confirm this is your own experience. We rate-limit 1 review per IP per station per 24 hours.

Quick check-in

1 tap · rate-limited

Tell the next driver what to expect.

Photo

Add a photo of City of Sheridan.

JPEG, PNG, WebP or HEIC, 5 MB max. EXIF is stripped on our side. Photos appear after a quick moderation pass.

Drag a photo here, or click to pick one.

JPEG, PNG, WebP, HEIC up to 5 MB