CLP Centenary Building
G/F CLP Centenary Building, 1 Toh Wah Road, Jordan, HK
3 ports
Ports at this station
- Available
CHAdeMO
1× · up to 50 kW
- Available
CCS2
1× · up to 50 kW
- Unknown
Type 2
1× · up to 43 kW
Station info
- Address
- G/F CLP Centenary Building, 1 Toh Wah Road, Jordan, Kowloon, Hong Kong
- Access
- 24 hours
- Total points
- 1
- Coordinates
- 22.30785, 114.16203
- Last verified
- 2015-11-12
About this stop
This EV charging station in Jordan, HK, offers CCS (Type 2), CHAdeMO, and Type 2 (Socket Only) connectors. It provides 50 kW peak rapid charging and has one charging point. The operator is listed as independent or unlisted. This location is operational.
With a 50 kW peak, this station can add about 20 miles of range to a typical EV in 10 minutes. It's best suited for quick top-ups for local drivers or those needing a faster charge while in the Jordan area, rather than a long road trip stop. EV charging in Jordan is expanding, and this station adds another option for drivers needing power.
6 closest stations
If this site is busy or out of service, here are the next best options within roughly 50 km.
No reviews yet. Be the first to tell other drivers what to expect.
Quick check-in
1 tap · rate-limited
Tell the next driver what to expect.
Add a photo of CLP Centenary Building.
JPEG, PNG, WebP or HEIC, 5 MB max. EXIF is stripped on our side. Photos appear after a quick moderation pass.
Drag a photo here, or click to pick one.
JPEG, PNG, WebP, HEIC up to 5 MB