chargevu
0 of 2 available50 kW peakChargePoint

CORE SEDALIA PALMER LAKE DC2

10 Primrose St, Palmer Lake, US

2 ports

Ports at this station

  • CHAdeMO

    1× · up to 50 kW

    Unknown
  • CCS1

    1× · up to 50 kW

    Unknown

Station info

Address
10 Primrose St, 80133, Palmer Lake, CO, United States
Access
24 hours daily
Coordinates
39.12306, -104.91404
Last verified
2025-11-11

About this stop

The CORE SEDALIA PALMER LAKE DC2 is an operational EV charging station in Palmer Lake, US. It is part of the ChargePoint network. The station offers rapid charging up to 50 kW and provides CCS (Type 1) and CHAdeMO connectors for compatible electric vehicles. This site adds to the options for EV charging in Palmer Lake.

A 50 kW peak charging speed means you can add roughly 100 miles of range to a compatible EV in about 40 minutes, depending on the vehicle's battery and current charge level. This makes the CORE SEDALIA PALMER LAKE DC2 a practical stop for topping up your battery on longer journeys or for residents needing a substantial charge. Check your vehicle's charging rate to estimate your specific charging time.

Nearby

6 closest stations

If this site is busy or out of service, here are the next best options within roughly 50 km.

Reviews

No reviews yet. Be the first to tell other drivers what to expect.

Anonymous review

Tell other drivers what happened at CORE SEDALIA PALMER LAKE DC2.

No account. No email harvested. Captcha is used to keep spammers out.

By submitting you confirm this is your own experience. We rate-limit 1 review per IP per station per 24 hours.

Quick check-in

1 tap · rate-limited

Tell the next driver what to expect.

Photo

Add a photo of CORE SEDALIA PALMER LAKE DC2.

JPEG, PNG, WebP or HEIC, 5 MB max. EXIF is stripped on our side. Photos appear after a quick moderation pass.

Drag a photo here, or click to pick one.

JPEG, PNG, WebP, HEIC up to 5 MB