Ports at this station
- Available
CCS2
1× · up to 150 kW
- Available
CCS2
1× · up to 150 kW
Station info
- Address
- Br. 381, km 677, Perdões, Brazil
- Coordinates
- -21.10734, -45.09288
- Last verified
- 2026-05-28
About this stop
This station at Crossville uses CCS (Type 2) connectors, compatible with most European and many American EVs. It is independently operated and is currently operational. The station delivers peak power of 150 kW, which is considered ultra-rapid charging. EV charging in Perdões includes this independent option.
A 150 kW peak charging rate can add approximately 100 miles of range to an EV in about 20 minutes, depending on the vehicle. This makes Crossville a practical stop for drivers needing a quick replenishment rather than a lengthy session. It serves as a quick top-up option for local drivers or an efficient stop for those passing through Perdões.
5 closest stations
If this site is busy or out of service, here are the next best options within roughly 50 km.
No reviews yet. Be the first to tell other drivers what to expect.
Quick check-in
1 tap · rate-limited
Tell the next driver what to expect.
Add a photo of Crossville.
JPEG, PNG, WebP or HEIC, 5 MB max. EXIF is stripped on our side. Photos appear after a quick moderation pass.
Drag a photo here, or click to pick one.
JPEG, PNG, WebP, HEIC up to 5 MB