Davis Chevrolet GMC Buick Ltd.
149 East Lake Cres NE, Airdrie, CA
2 ports
Ports at this station
- Unknown
CHAdeMO
1× · up to 40 kW
- Unknown
CCS1
1× · up to 40 kW
Station info
- Address
- 149 East Lake Cres NE, T4A 2H7, Airdrie, AB, Canada
- Access
- 24 hours daily
- Phone
- 888-356-8911
- Website
- flo.ca
- Coordinates
- 51.28777, -113.99919
- Last verified
- 2023-03-07
About this stop
This flo station at Davis Chevrolet GMC Buick Ltd. in Airdrie, CA offers 40 kW peak charging. It is suited for drivers who need a slower AC charge, and it is operational. The station provides CCS (Type 1) and CHAdeMO connectors. EV charging in Airdrie is expanding.
A 40 kW peak charging speed means you can add about 100 miles of range to a typical EV in roughly 1 hour. This is more of a local top-up station than a quick road trip stop. It is an adequate option for topping up your battery while you are in the area. The number of charging points is not specified.
6 closest stations
If this site is busy or out of service, here are the next best options within roughly 50 km.
No reviews yet. Be the first to tell other drivers what to expect.
Quick check-in
1 tap · rate-limited
Tell the next driver what to expect.
Add a photo of Davis Chevrolet GMC Buick Ltd..
JPEG, PNG, WebP or HEIC, 5 MB max. EXIF is stripped on our side. Photos appear after a quick moderation pass.
Drag a photo here, or click to pick one.
JPEG, PNG, WebP, HEIC up to 5 MB