chargevu
0 of 2 available50 kW peakChargePoint

DAVIS COUNTY UT DCG WEST

28 E State St, Farmington, US

2 ports

Ports at this station

  • CHAdeMO

    1× · up to 50 kW

    Unknown
  • CCS1

    1× · up to 50 kW

    Unknown

Station info

Address
28 E State St, 84025, Farmington, UT, United States
Access
24 hours daily
Coordinates
40.97955, -111.88694
Last verified
2025-06-24

About this stop

DAVIS COUNTY UT DCG WEST is a ChargePoint station located in Farmington, US. It offers rapid charging with a peak power of 50 kW. The station is equipped with CCS (Type 1) and CHAdeMO connectors. It is currently reported as operational.

For drivers looking for EV charging in Farmington, this station can add about 20 miles of range in 20 minutes at its peak 50 kW output. This makes it a practical stop for quick top-ups or potentially for longer trips if your vehicle charges efficiently. The presence of both CCS and CHAdeMO connectors accommodates a wider range of electric vehicles. Charging points are available, though the exact number is not specified.

Nearby

6 closest stations

If this site is busy or out of service, here are the next best options within roughly 50 km.

Reviews

No reviews yet. Be the first to tell other drivers what to expect.

Anonymous review

Tell other drivers what happened at DAVIS COUNTY UT DCG WEST.

No account. No email harvested. Captcha is used to keep spammers out.

By submitting you confirm this is your own experience. We rate-limit 1 review per IP per station per 24 hours.

Quick check-in

1 tap · rate-limited

Tell the next driver what to expect.

Photo

Add a photo of DAVIS COUNTY UT DCG WEST.

JPEG, PNG, WebP or HEIC, 5 MB max. EXIF is stripped on our side. Photos appear after a quick moderation pass.

Drag a photo here, or click to pick one.

JPEG, PNG, WebP, HEIC up to 5 MB