Ports at this station
- Unknown
Type 1 (J1772)
2× · up to 6.6 kW
- Available
CCS1
1× · up to 50 kW
- Available
CCS1
1× · up to 50 kW
Station info
- Address
- 34001 CA-120, 95321, Groveland, CA, United States
- Access
- 24 hours daily
- Phone
- 888-758-4389
- Website
- chargepoint.com
- Coordinates
- 37.81351, -119.88008
- Last verified
- 2020-09-15
About this stop
This ChargePoint station, DC CORRIDOR, sits in Groveland, US. It offers 50 kW peak rapid charging, suitable for drivers needing a quick energy boost. The site has charging points with both CCS (Type 1) and standard Type 1 (J1772) connectors. The reported status of the chargers is currently unknown. EV charging in Groveland is available at this location.
A 50 kW peak charge means you can add approximately 100 miles of range to a typical EV in under an hour. This makes DC CORRIDOR a practical option for drivers needing to top up while running local errands or on longer journeys where a more moderate charging speed is acceptable. It is not designed for ultra-fast charging speeds but provides a solid option for intermediate charging stops.
6 closest stations
If this site is busy or out of service, here are the next best options within roughly 50 km.
No reviews yet. Be the first to tell other drivers what to expect.
Quick check-in
1 tap · rate-limited
Tell the next driver what to expect.
Add a photo of DC CORRIDOR.
JPEG, PNG, WebP or HEIC, 5 MB max. EXIF is stripped on our side. Photos appear after a quick moderation pass.
Drag a photo here, or click to pick one.
JPEG, PNG, WebP, HEIC up to 5 MB