chargevu
0 of 2 available50 kW peakChargePoint

DC CORRIDOR RIVER PARK DC1

220 E Paseo Del Centro, Fresno, US

2 ports

Ports at this station

  • CHAdeMO

    1× · up to 50 kW

    Unknown
  • CCS1

    1× · up to 50 kW

    Unknown

Station info

Address
220 E Paseo Del Centro, 93720, Fresno, CA, United States
Access
24 hours daily
Coordinates
36.85153, -119.78890
Last verified
2025-11-11

About this stop

This ChargePoint station offers CCS (Type 1) and CHAdeMO connectors for your electric car. It is located in Fresno, US. The station provides up to 50 kW of peak rapid charging power.

For EV charging in Fresno, this 50 kW station is best for quick top-ups or necessary charging rather than fully replenishing a battery, as it adds about 20 to 25 miles of range per 15 minutes of charging. This means it can help you continue your journey but might not be the fastest option for a full charge. Its operational status means it is ready for use.

Nearby

6 closest stations

If this site is busy or out of service, here are the next best options within roughly 50 km.

Reviews

No reviews yet. Be the first to tell other drivers what to expect.

Anonymous review

Tell other drivers what happened at DC CORRIDOR RIVER PARK DC1.

No account. No email harvested. Captcha is used to keep spammers out.

By submitting you confirm this is your own experience. We rate-limit 1 review per IP per station per 24 hours.

Quick check-in

1 tap · rate-limited

Tell the next driver what to expect.

Photo

Add a photo of DC CORRIDOR RIVER PARK DC1.

JPEG, PNG, WebP or HEIC, 5 MB max. EXIF is stripped on our side. Photos appear after a quick moderation pass.

Drag a photo here, or click to pick one.

JPEG, PNG, WebP, HEIC up to 5 MB