chargevu
1 of 1 available24 kW peakChargePoint

Dirito Brothers Volkswagen

2020 N Main Street, Walnut Creek, US

1 port · $0.20/minute

Ports at this station

  • CCS1

    1× · up to 24 kW

    Available

Station info

Address
2020 N Main Street, 94596, Walnut Creek, California, United States
Total points
1
Coordinates
37.90754, -122.06414
Last verified
2016-11-21

About this stop

This ChargePoint station at Dirito Brothers Volkswagen in Walnut Creek offers 24 kW peak AC charging, suitable for drivers who need a slower charge. It has one charging point with a CCS (Type 1) connector and is currently operational. This is a practical EV charging stop in Walnut Creek for local drivers or those needing a modest battery top-up rather than a rapid refill. A 24 kW peak speed means you might add around 10-15 miles of range per hour, depending on your vehicle's charging rate and battery temperature. Expect to spend more time here than at a DC fast charger, making it best for planned stops or when you have other errands to run. The cost is $0.20 per minute.

Nearby

6 closest stations

If this site is busy or out of service, here are the next best options within roughly 50 km.

Reviews

No reviews yet. Be the first to tell other drivers what to expect.

Anonymous review

Tell other drivers what happened at Dirito Brothers Volkswagen.

No account. No email harvested. Captcha is used to keep spammers out.

By submitting you confirm this is your own experience. We rate-limit 1 review per IP per station per 24 hours.

Quick check-in

1 tap · rate-limited

Tell the next driver what to expect.

Photo

Add a photo of Dirito Brothers Volkswagen.

JPEG, PNG, WebP or HEIC, 5 MB max. EXIF is stripped on our side. Photos appear after a quick moderation pass.

Drag a photo here, or click to pick one.

JPEG, PNG, WebP, HEIC up to 5 MB