chargevu
0 of 2 available50 kW peakChargePoint

DK TIRES STATION 2

530 Myatt Dr, Nashville, US

2 ports

Ports at this station

  • CHAdeMO

    1× · up to 50 kW

    Unknown
  • CCS1

    1× · up to 50 kW

    Unknown

Station info

Address
530 Myatt Dr, 37115, Nashville, TN, United States
Access
Mon: 12:00am-12:00am; Tue: 12:00am-12:00am; Wed: 12:00am-12:00am; Thu: 12:00am-12:00am; Fri: 12:00am-12:00am; Sat: 12:00am-12:00am; Sun: 12:00am-12:00am
Coordinates
36.28345, -86.69600
Last verified
2025-11-11

About this stop

This ChargePoint station at DK TIRES STATION 2 in Nashville offers CCS (Type 1) and CHAdeMO connectors, fitting most electric vehicles. It operates at a peak power of 50 kW, providing rapid charging.

Fifty kilowatts means this station can add about 150 miles of range to an EV with a compatible battery in one hour of charging. This makes it a useful stop for drivers needing a quick charge while in the area, or for topping up if you live nearby. It is one of several EV charging options in Nashville.

Nearby

6 closest stations

If this site is busy or out of service, here are the next best options within roughly 50 km.

Reviews

No reviews yet. Be the first to tell other drivers what to expect.

Anonymous review

Tell other drivers what happened at DK TIRES STATION 2.

No account. No email harvested. Captcha is used to keep spammers out.

By submitting you confirm this is your own experience. We rate-limit 1 review per IP per station per 24 hours.

Quick check-in

1 tap · rate-limited

Tell the next driver what to expect.

Photo

Add a photo of DK TIRES STATION 2.

JPEG, PNG, WebP or HEIC, 5 MB max. EXIF is stripped on our side. Photos appear after a quick moderation pass.

Drag a photo here, or click to pick one.

JPEG, PNG, WebP, HEIC up to 5 MB