chargevu
0 of 2 available50 kW peakEVGateway

Don Jackson Jeep

5855 GA-400, Cumming, US

2 ports

Ports at this station

  • CCS1

    2× · up to 50 kW

    Unknown

Station info

Address
5855 GA-400, 30028, Cumming, GA, United States
Access
24 hours daily
Coordinates
34.31048, -84.06753
Last verified
2025-11-11

About this stop

EVGateway operates this rapid EV charging station at Don Jackson Jeep in Cumming, US. It offers peak power of 50 kW and uses CCS (Type 1) connectors. The station is reported as operational. This site contributes to EV charging in Cumming.

At 50 kW peak, this station is best suited for topping up your battery rather than a full charge on a long road trip. For context, 50 kW can add roughly 100 miles of range to a compatible EV in about an hour, depending on the vehicle's battery size and current charge level. Always check your vehicle's charging speed capabilities before arriving.

Nearby

6 closest stations

If this site is busy or out of service, here are the next best options within roughly 50 km.

Reviews

No reviews yet. Be the first to tell other drivers what to expect.

Anonymous review

Tell other drivers what happened at Don Jackson Jeep.

No account. No email harvested. Captcha is used to keep spammers out.

By submitting you confirm this is your own experience. We rate-limit 1 review per IP per station per 24 hours.

Quick check-in

1 tap · rate-limited

Tell the next driver what to expect.

Photo

Add a photo of Don Jackson Jeep.

JPEG, PNG, WebP or HEIC, 5 MB max. EXIF is stripped on our side. Photos appear after a quick moderation pass.

Drag a photo here, or click to pick one.

JPEG, PNG, WebP, HEIC up to 5 MB