chargevu
1 of 1 available40 kW peakIndependent

DSA X - Brabus Boituva

Av. do Trabalhador, 1441 - Centro Empresarial Castello Branco, Boituva - SP, , Boituva, BR

1 port

Ports at this station

  • CCS2

    1× · up to 40 kW

    Available

Station info

Address
Av. do Trabalhador, 1441 - Centro Empresarial Castello Branco, Boituva - SP, , Boituva, Brazil
Coordinates
-23.29917, -47.66501
Last verified
2026-07-12

About this stop

This DSA X - Brabus Boituva station offers 40 kW peak AC charging, suitable for drivers needing a slower but steady charge. It has CCS (Type 2) connectors. The operator is independent or unlisted, and the station is currently operational. This is one option for EV charging in Boituva.

A 40 kW peak charging speed means you can add roughly 15 to 20 miles of range per hour. This is ideal for a local top-up or a stopover on a longer journey where time is less critical than at a DC fast charger. Plan accordingly for your charging needs with this AC station.

Nearby

6 closest stations

If this site is busy or out of service, here are the next best options within roughly 50 km.

Reviews

No reviews yet. Be the first to tell other drivers what to expect.

Anonymous review

Tell other drivers what happened at DSA X - Brabus Boituva.

No account. No email harvested. Captcha is used to keep spammers out.

By submitting you confirm this is your own experience. We rate-limit 1 review per IP per station per 24 hours.

Quick check-in

1 tap · rate-limited

Tell the next driver what to expect.

Photo

Add a photo of DSA X - Brabus Boituva.

JPEG, PNG, WebP or HEIC, 5 MB max. EXIF is stripped on our side. Photos appear after a quick moderation pass.

Drag a photo here, or click to pick one.

JPEG, PNG, WebP, HEIC up to 5 MB