chargevu
4 of 4 operational100 kW peakTotalEnergies (ES)

E.S. CEPSA Mavilar

CEPSA, Curtis, ES

4 ports · 0.50€/kWh >60kW - 0,39€/kWh DC - 0,32€/kWh AC

Ports at this station

  • CCS2

    2× · up to 100 kW

    Operational
  • CHAdeMO

    1× · up to 50 kW

    Operational
  • Type 2

    1× · up to 22 kW

    Operational

Station info

Address
CEPSA, 27309, Curtis, Galicia, Spain
Total points
2
Coordinates
43.18122, -7.96808
Last verified
2025-09-18

How this site compares

In Spain

Top 15% by peak power

Among 20,601 sites with a known peak power

TotalEnergies (ES)

279 sites across 141 cities in Spain

All TotalEnergies (ES) sites in Spain →

50 kW+ within 25 km

17 other sites, 6 at 150 kW or more

Nearest: E.S Galp Guitiriz (Sur) · 3.3 km · 150 kW · PowerDot (Es)

About this stop

Station equiped witn a boost battery. Max power can be reduced when batery is low of charge

Nearby

6 closest stations

If this site is busy or out of service, here are the next best options within roughly 50 km.

Reviews

No reviews yet. Be the first to tell other drivers what to expect.

Anonymous review

Tell other drivers what happened at E.S. CEPSA Mavilar.

No account. No email harvested. Captcha is used to keep spammers out.

By submitting you confirm this is your own experience. We rate-limit 1 review per IP per station per 24 hours.

Quick check-in

1 tap · rate-limited

Tell the next driver what to expect.

Photo

Add a photo of E.S. CEPSA Mavilar.

JPEG, PNG, WebP or HEIC, 5 MB max. EXIF is stripped on our side. Photos appear after a quick moderation pass.

Drag a photo here, or click to pick one.

JPEG, PNG, WebP, HEIC up to 5 MB