E-Wald GmbH
Technologiecampus 1, Teisnach, DE
33 ports
Ports at this station
- Operational
Type 2
14× · up to 22 kW
- Operational
Schuko (CEE 7/4)
17× · up to 3.7 kW
- Operational
CHAdeMO
1× · up to 50 kW
- Operational
CCS2
1× · up to 50 kW
Station info
- Address
- Technologiecampus 1, 94224, Teisnach, Germany
- Access
- Bei vorheriger Anmeldung kann auch ohne Karte kostenlos geladen werden.
- Total points
- 20
- Coordinates
- 49.02512, 13.00408
- Last verified
- 2015-05-08
How this site compares
- In Germany
Top 15% by peak power
Among 24,501 sites with a known peak power
- E-Wald
274 sites across 189 cities in Germany
- 50 kW+ within 25 km
5 other sites, 2 at 150 kW or more
Nearest: Comfortcharge Ladestation · 20.2 km · 100 kW · Comfortcharge
About this stop
Die Chademo und die CCS Säule stehen vor dem Eingang. Renault Zoe darf keinen Typ2 Anschluss benutzen! 24/7 nutzbar mit E-Wald Ladekarte.
6 closest stations
If this site is busy or out of service, here are the next best options within roughly 50 km.
No reviews yet. Be the first to tell other drivers what to expect.
Quick check-in
1 tap · rate-limited
Tell the next driver what to expect.
Add a photo of E-Wald GmbH.
JPEG, PNG, WebP or HEIC, 5 MB max. EXIF is stripped on our side. Photos appear after a quick moderation pass.
Drag a photo here, or click to pick one.
JPEG, PNG, WebP, HEIC up to 5 MB