E6 Costanera Norte / Ruta 68
Costanera Norte Km 33.75, Pudahuel, CL
3 ports · 250
Ports at this station
- Available
Type 2
1× · up to 43 kW
- Available
CHAdeMO
1× · up to 50 kW
- Available
CCS2
1× · up to 50 kW
Station info
- Address
- Costanera Norte Km 33.75, Pudahuel, Región Metropolitana de Santiago, Chile
- Access
- Entrada en ambas direcciones por Costanera Norte. Oriente - Poniente a mano derecha y Poniente - Oriente a mano izquierda
- Total points
- 1
- Website
- copecvoltex.cl
- Coordinates
- -33.43420, -70.81058
- Last verified
- 2021-08-18
About this stop
For drivers needing a rapid charge in Pudahuel, the E6 Costanera Norte / Ruta 68 station run by Copec Voltex delivers up to 50 kW peak power. It offers one charging point with CCS (Type 2), CHAdeMO, and Type 2 socket connectors. This station is operational.
A 50 kW rapid charger can add about 100 miles of range to a typical EV in 30 to 40 minutes. This makes it suitable for a quick top-up during a longer journey or for drivers who need to add range while running errands. The reported cost is 250, though rates can change. Look for this station for EV charging in Pudahuel.
6 closest stations
If this site is busy or out of service, here are the next best options within roughly 50 km.
No reviews yet. Be the first to tell other drivers what to expect.
Quick check-in
1 tap · rate-limited
Tell the next driver what to expect.
Add a photo of E6 Costanera Norte / Ruta 68.
JPEG, PNG, WebP or HEIC, 5 MB max. EXIF is stripped on our side. Photos appear after a quick moderation pass.
Drag a photo here, or click to pick one.
JPEG, PNG, WebP, HEIC up to 5 MB