chargevu
1 of 1 available80 kW peakIndependent

Estação Guapo | APP On Charge (CCS2 - 80kW)

R. José Antônio Bordignon, 400, Palmeira, BR

1 port

Ports at this station

  • CCS2

    1× · up to 80 kW

    Available

Station info

Address
R. José Antônio Bordignon, 400, 84130-000, Palmeira, PR, Brazil
Total points
1
Coordinates
-25.43139, -49.99427
Last verified
2025-05-26

About this stop

This station offers 80kW peak charging for drivers needing a rapid charge. Located in Palmeira, Brazil, it features one CCS (Type 2) connector. The operator is independent or unlisted. This site is operational.

An 80kW peak charge speed is suitable for topping up battery packs that support this rate, adding approximately 100 miles of range in 20 minutes, depending on the vehicle and battery temperature. Consider this an option for EV charging in Palmeira when you need a quick boost rather than a full overnight charge.

Nearby

6 closest stations

If this site is busy or out of service, here are the next best options within roughly 50 km.

Reviews

No reviews yet. Be the first to tell other drivers what to expect.

Anonymous review

Tell other drivers what happened at Estação Guapo | APP On Charge (CCS2 - 80kW).

No account. No email harvested. Captcha is used to keep spammers out.

By submitting you confirm this is your own experience. We rate-limit 1 review per IP per station per 24 hours.

Quick check-in

1 tap · rate-limited

Tell the next driver what to expect.

Photo

Add a photo of Estação Guapo | APP On Charge (CCS2 - 80kW).

JPEG, PNG, WebP or HEIC, 5 MB max. EXIF is stripped on our side. Photos appear after a quick moderation pass.

Drag a photo here, or click to pick one.

JPEG, PNG, WebP, HEIC up to 5 MB