Ports at this station
- Available
CCS2
2× · up to 300 kW
Station info
- Address
- Industriestraße 2, 89188 , Merklingen, Germany
- Total points
- 2
- Coordinates
- 48.51455, 9.75833
- Last verified
- 2025-08-11
About this stop
This EWE Go station in Merklingen provides CCS (Type 2) connectors for most modern EVs. It offers 300 kW peak power across two charging points, identified as operational. This EWE network site is equipped for ultra-rapid charging.
With 300 kW peak output, this station can add roughly 200 miles of range to a compatible EV in about 15 minutes. It serves as a convenient stop for EV charging in Merklingen, suitable for both quick local top-ups and longer journeys where rapid charging is essential. The EWE Go Hildesheim station is a practical option for drivers needing significant range quickly.
5 closest stations
If this site is busy or out of service, here are the next best options within roughly 50 km.
No reviews yet. Be the first to tell other drivers what to expect.
Quick check-in
1 tap · rate-limited
Tell the next driver what to expect.
Add a photo of EWE Go Hildesheim.
JPEG, PNG, WebP or HEIC, 5 MB max. EXIF is stripped on our side. Photos appear after a quick moderation pass.
Drag a photo here, or click to pick one.
JPEG, PNG, WebP, HEIC up to 5 MB