chargevu
0 of 1 available3.7 kW peakIndependent

Ford DTE Central Energy Plant

Carroll Shelby Way, Dearborn, US

1 port

Ports at this station

  • Type 1 (J1772)

    1× · up to 3.7 kW

    Unknown

Station info

Address
Carroll Shelby Way, 48124, Dearborn, MI, United States
Access
24 hours daily
Coordinates
42.29688, -83.23087
Last verified
2023-06-11

About this stop

This station in Dearborn, US, offers Type 1 (J1772) connectors. These fit most older EVs and some newer models. The operator is independent or unlisted. Power tops out at 4 kW AC, which is slower charging.

At 4 kW, expect to add about 10 to 15 miles of range per hour of charging. This is suitable for local top-ups or topping up while parked for an extended period, rather than quick road-trip stops. EV charging in Dearborn has limited fast-charging options, making this a utility choice for specific needs.

Nearby

6 closest stations

If this site is busy or out of service, here are the next best options within roughly 50 km.

Reviews

No reviews yet. Be the first to tell other drivers what to expect.

Anonymous review

Tell other drivers what happened at Ford DTE Central Energy Plant.

No account. No email harvested. Captcha is used to keep spammers out.

By submitting you confirm this is your own experience. We rate-limit 1 review per IP per station per 24 hours.

Quick check-in

1 tap · rate-limited

Tell the next driver what to expect.

Photo

Add a photo of Ford DTE Central Energy Plant.

JPEG, PNG, WebP or HEIC, 5 MB max. EXIF is stripped on our side. Photos appear after a quick moderation pass.

Drag a photo here, or click to pick one.

JPEG, PNG, WebP, HEIC up to 5 MB