chargevu
0 of 4 available50 kW peakIndependent

Ford Motor Company - Fairlane Business Park

17425 Federal Dr, Allen Park, US

4 ports

Ports at this station

  • Type 1 (J1772)

    2× · up to 3.7 kW

    Unknown
  • CHAdeMO

    1× · up to 50 kW

    Unknown
  • CCS1

    1× · up to 50 kW

    Unknown

Station info

Address
17425 Federal Dr, 48101, Allen Park, MI, United States
Access
24 hours daily
Coordinates
42.29312, -83.20136
Last verified
2025-11-11

About this stop

This independent EV charging station is located at Ford Motor Company's Fairlane Business Park in Allen Park, US. It provides rapid charging with a peak power output of 50 kW. The site is equipped with multiple connector types, including CCS (Type 1), CHAdeMO, and Type 1 (J1772), to accommodate a variety of electric vehicles. Its operational status indicates it is ready for use.

This station is best suited for a quick top-up rather than a lengthy charge. A 50 kW peak power means you can add about 100 miles of range to a compatible EV in roughly 30 to 40 minutes, depending on the vehicle's battery size and current state of charge. It's a practical option for EV charging in Allen Park, offering flexibility with its diverse connector options.

Nearby

6 closest stations

If this site is busy or out of service, here are the next best options within roughly 50 km.

Reviews

No reviews yet. Be the first to tell other drivers what to expect.

Anonymous review

Tell other drivers what happened at Ford Motor Company - Fairlane Business Park.

No account. No email harvested. Captcha is used to keep spammers out.

By submitting you confirm this is your own experience. We rate-limit 1 review per IP per station per 24 hours.

Quick check-in

1 tap · rate-limited

Tell the next driver what to expect.

Photo

Add a photo of Ford Motor Company - Fairlane Business Park.

JPEG, PNG, WebP or HEIC, 5 MB max. EXIF is stripped on our side. Photos appear after a quick moderation pass.

Drag a photo here, or click to pick one.

JPEG, PNG, WebP, HEIC up to 5 MB