chargevu
0 of 2 available50 kW peakChargePoint

G&M OIL CHEVRON #142

12555 Paramount Blvd, Downey, US

2 ports

Ports at this station

  • CHAdeMO

    1× · up to 50 kW

    Unknown
  • CCS1

    1× · up to 50 kW

    Unknown

Station info

Address
12555 Paramount Blvd, 90242, Downey, CA, United States
Access
24 hours daily
Coordinates
33.92461, -118.15186
Last verified
2025-11-11

About this stop

This ChargePoint station is located at G&M OIL CHEVRON #142 in Downey, US. It provides rapid charging with a peak power output of 50 kW. The station is equipped with CCS (Type 1) and CHAdeMO connectors.

For EV charging in Downey, this station offers a rapid charge. 50 kW peak power means you can add about 150 miles of range to a typical EV in one hour. This makes it useful for quick top-ups or longer journeys where you need to add a significant amount of range relatively fast. The station is reported as operational.

Nearby

6 closest stations

If this site is busy or out of service, here are the next best options within roughly 50 km.

Reviews

No reviews yet. Be the first to tell other drivers what to expect.

Anonymous review

Tell other drivers what happened at G&M OIL CHEVRON #142.

No account. No email harvested. Captcha is used to keep spammers out.

By submitting you confirm this is your own experience. We rate-limit 1 review per IP per station per 24 hours.

Quick check-in

1 tap · rate-limited

Tell the next driver what to expect.

Photo

Add a photo of G&M OIL CHEVRON #142.

JPEG, PNG, WebP or HEIC, 5 MB max. EXIF is stripped on our side. Photos appear after a quick moderation pass.

Drag a photo here, or click to pick one.

JPEG, PNG, WebP, HEIC up to 5 MB