chargevu
0 of 2 available50 kW peakChargePoint

GEORGIA POWER LAVISTA DC

3959 LaVista Rd, Tucker, US

2 ports

Ports at this station

  • CHAdeMO

    1× · up to 50 kW

    Unknown
  • CCS1

    1× · up to 50 kW

    Unknown

Station info

Address
3959 LaVista Rd, 30084, Tucker, GA, United States
Access
24 hours daily
Coordinates
33.84398, -84.25663
Last verified
2025-11-11

About this stop

This ChargePoint station, GEORGIA POWER LAVISTA DC, is located in Tucker, US. It offers 50 kW peak rapid charging, suitable for drivers needing a quick charge. The station provides CCS (Type 1) and CHAdeMO connectors. With an unstated number of charging points, it supports common EV standards. EV charging in Tucker is available at this operational site.

A 50 kW peak charging speed means you can add about 100 miles of range to a typical EV in roughly an hour, depending on your car and battery temperature. This station is best suited for topping up your battery during local errands or as a mid-range charging stop rather than a primary destination for very long journeys. Its operational status ensures availability for drivers in the area.

Nearby

6 closest stations

If this site is busy or out of service, here are the next best options within roughly 50 km.

Reviews

No reviews yet. Be the first to tell other drivers what to expect.

Anonymous review

Tell other drivers what happened at GEORGIA POWER LAVISTA DC.

No account. No email harvested. Captcha is used to keep spammers out.

By submitting you confirm this is your own experience. We rate-limit 1 review per IP per station per 24 hours.

Quick check-in

1 tap · rate-limited

Tell the next driver what to expect.

Photo

Add a photo of GEORGIA POWER LAVISTA DC.

JPEG, PNG, WebP or HEIC, 5 MB max. EXIF is stripped on our side. Photos appear after a quick moderation pass.

Drag a photo here, or click to pick one.

JPEG, PNG, WebP, HEIC up to 5 MB