Hauptstraße 1
Hauptstraße 1, Cremlingen, DE
2 ports
Ports at this station
- Available
CCS2
1× · up to 22 kW
- Available
Type 2
1× · up to 11 kW
Station info
- Address
- Hauptstraße 1, 38162, Cremlingen, Germany
- Coordinates
- 52.24927, 10.64724
- Last verified
- 2021-07-12
About this stop
Hauptstraße 1 is an EV charging station located in Cremlingen, Germany. It is operated by an independent or unlisted network. The station provides 22 kW peak AC charging, which is slower than DC fast charging. You will find connectors for CCS (Type 2) and Type 2 sockets on site. The current status of the charging points is unknown. This station is part of the EV charging in Cremlingen options.
A 22 kW peak charging speed means you can add about 70-100 miles of range per hour of charging, depending on your vehicle. This is generally suitable for local top-ups or longer stops, rather than quick top-ups during a long road trip. Drivers should verify the availability of points before arriving, as the number of charging points is not specified and the status is reported as unknown.
6 closest stations
If this site is busy or out of service, here are the next best options within roughly 50 km.
No reviews yet. Be the first to tell other drivers what to expect.
Quick check-in
1 tap · rate-limited
Tell the next driver what to expect.
Add a photo of Hauptstraße 1.
JPEG, PNG, WebP or HEIC, 5 MB max. EXIF is stripped on our side. Photos appear after a quick moderation pass.
Drag a photo here, or click to pick one.
JPEG, PNG, WebP, HEIC up to 5 MB