chargevu
2 of 2 available22 kW peakIndependent

Hauptstraße 113

Hauptstraße 113, Lübbecke, DE

2 ports

Ports at this station

  • CCS2

    1× · up to 22 kW

    Available
  • Type 2

    1× · up to 11 kW

    Available

Station info

Address
Hauptstraße 113, 32312, Lübbecke, Germany
Coordinates
52.30279, 8.56216
Last verified
2021-07-12

About this stop

In Lübbecke, Germany, you'll find an independent EV charging station at Hauptstraße 113. It offers 22 kW peak AC charging, which is slower than DC fast chargers. The station provides connectors for CCS (Type 2) and a Type 2 socket-only option. This setup is suitable for topping up your battery while parked locally.

For most EVs, 22 kW means you'll add about 80-100 miles of range per hour of charging. This is adequate for local EV charging needs in Lübbecke but may not be fast enough for rapid long-distance travel where higher kW chargers are preferred. The number of charging points is not specified. The station is currently reported as operational.

Nearby

6 closest stations

If this site is busy or out of service, here are the next best options within roughly 50 km.

Reviews

No reviews yet. Be the first to tell other drivers what to expect.

Anonymous review

Tell other drivers what happened at Hauptstraße 113.

No account. No email harvested. Captcha is used to keep spammers out.

By submitting you confirm this is your own experience. We rate-limit 1 review per IP per station per 24 hours.

Quick check-in

1 tap · rate-limited

Tell the next driver what to expect.

Photo

Add a photo of Hauptstraße 113.

JPEG, PNG, WebP or HEIC, 5 MB max. EXIF is stripped on our side. Photos appear after a quick moderation pass.

Drag a photo here, or click to pick one.

JPEG, PNG, WebP, HEIC up to 5 MB