chargevu
0 of 1 available40 kW peakChargePoint

HD OF SI

1973 Forest Ave, Mariners Harbor, US

1 port

Ports at this station

  • CCS1

    1× · up to 40 kW

    Unknown

Station info

Address
1973 Forest Ave, 10303, Mariners Harbor, NY, United States
Access
24 hours daily
Coordinates
40.62619, -74.15514
Last verified
2020-06-26

About this stop

This ChargePoint station at HD OF SI in Mariners Harbor offers 40 kW peak charging. It is suitable for drivers who need a slower AC charge. The station is equipped with CCS (Type 1) connectors for your EV. This is one option for EV charging in Mariners Harbor.

A 40 kW peak charging speed means adding about 15-20 miles of range per hour. It is best suited for local top-ups or longer stops rather than a quick road trip charge. The number of charging points on site is not specified. The station is currently reported as operational.

Nearby

6 closest stations

If this site is busy or out of service, here are the next best options within roughly 50 km.

Reviews

No reviews yet. Be the first to tell other drivers what to expect.

Anonymous review

Tell other drivers what happened at HD OF SI.

No account. No email harvested. Captcha is used to keep spammers out.

By submitting you confirm this is your own experience. We rate-limit 1 review per IP per station per 24 hours.

Quick check-in

1 tap · rate-limited

Tell the next driver what to expect.

Photo

Add a photo of HD OF SI.

JPEG, PNG, WebP or HEIC, 5 MB max. EXIF is stripped on our side. Photos appear after a quick moderation pass.

Drag a photo here, or click to pick one.

JPEG, PNG, WebP, HEIC up to 5 MB