chargevu
0 of 2 available50 kW peakChargePoint

HOUGHTON HOUGHTON 1 WEST

609 Shelden Ave, Houghton, US

2 ports

Ports at this station

  • CHAdeMO

    1× · up to 50 kW

    Unknown
  • CCS1

    1× · up to 50 kW

    Unknown

Station info

Address
609 Shelden Ave, 49931, Houghton, MI, United States
Access
24 hours daily
Coordinates
47.12159, -88.56674
Last verified
2025-11-11

About this stop

This ChargePoint station in Houghton, US, offers CCS (Type 1) and CHAdeMO connectors, fitting most EVs sold in North America and Japan. The station is operational. It provides 50 kW peak power, which adds about 20 miles of range per hour of charging for many electric cars. This makes it a practical option for EV charging in Houghton. It is well-suited for quick top-ups or extending range during longer journeys. While not the fastest charging available, 50 kW is enough to add substantial range during a short break. The exact number of charging points is not specified, but the connectors and peak power make it a useful stop for local drivers and those passing through.

Nearby

6 closest stations

If this site is busy or out of service, here are the next best options within roughly 50 km.

Reviews

No reviews yet. Be the first to tell other drivers what to expect.

Anonymous review

Tell other drivers what happened at HOUGHTON HOUGHTON 1 WEST.

No account. No email harvested. Captcha is used to keep spammers out.

By submitting you confirm this is your own experience. We rate-limit 1 review per IP per station per 24 hours.

Quick check-in

1 tap · rate-limited

Tell the next driver what to expect.

Photo

Add a photo of HOUGHTON HOUGHTON 1 WEST.

JPEG, PNG, WebP or HEIC, 5 MB max. EXIF is stripped on our side. Photos appear after a quick moderation pass.

Drag a photo here, or click to pick one.

JPEG, PNG, WebP, HEIC up to 5 MB