chargevu
0 of 2 available50 kW peakChargePoint

HUDSON TOYOTA CPE250 #2

617 NJ-440, Jersey City, US

2 ports

Ports at this station

  • CHAdeMO

    1× · up to 50 kW

    Unknown
  • CCS1

    1× · up to 50 kW

    Unknown

Station info

Address
617 NJ-440, 07305, Jersey City, NJ, United States
Access
24 hours daily
Coordinates
40.71745, -74.09601
Last verified
2025-11-11

About this stop

ChargePoint operates the HUDSON TOYOTA CPE250 #2 station in Jersey City, US. This rapid charging site offers a peak power output of 50 kW. Connectors available include CCS (Type 1) and CHAdeMO. EV charging in Jersey City includes this operational ChargePoint location.

This station is best suited for topping up your battery rather than a full charge on a long journey. A 50 kW peak charge rate means you might add about 100 miles of range to a compatible EV in an hour, depending on the vehicle and its battery conditions. This speed is faster than most Level 2 chargers but slower than the fastest DC fast chargers currently available.

Nearby

6 closest stations

If this site is busy or out of service, here are the next best options within roughly 50 km.

Reviews

No reviews yet. Be the first to tell other drivers what to expect.

Anonymous review

Tell other drivers what happened at HUDSON TOYOTA CPE250 #2.

No account. No email harvested. Captcha is used to keep spammers out.

By submitting you confirm this is your own experience. We rate-limit 1 review per IP per station per 24 hours.

Quick check-in

1 tap · rate-limited

Tell the next driver what to expect.

Photo

Add a photo of HUDSON TOYOTA CPE250 #2.

JPEG, PNG, WebP or HEIC, 5 MB max. EXIF is stripped on our side. Photos appear after a quick moderation pass.

Drag a photo here, or click to pick one.

JPEG, PNG, WebP, HEIC up to 5 MB