chargevu
1 of 1 available60 kW peakIKARUS (Egypt)

Hydepark: HydeOut ๐Ÿฝ๏ธ๐Ÿน

XGGV+GCW, New Cairo 1, Cairo Governorate 4762021, Egypt, Cairo, EG

1 port

Ports at this station

  • CCS2

    1ร— ยท up to 60 kW

    Available

Station info

Address
XGGV+GCW, New Cairo 1, Cairo Governorate 4762021, Egypt, Cairo, ุงู„ู‚ุงู‡ุฑุฉ, Egypt
Access
Access requires the IKARUS Grid app/account; verify current availability before travel.
Total points
1
Coordinates
29.97636, 31.54358
Last verified
2026-06-16

About this stop

This IKARUS-operated station offers 60 kW peak charging power, suitable for drivers needing a quick charge. Located in New Cairo, Egypt, it features 2 charging points equipped with CCS (Type 2) connectors. The station is currently operational.

With 60 kW peak power, this station is a practical option for EV charging in New Cairo, whether for a local top-up or a brief stop. This charging speed means a driver could add approximately 100 miles of range to a typical EV in about 30 to 40 minutes, depending on the vehicle's battery size and current charge level.

Nearby

6 closest stations

If this site is busy or out of service, here are the next best options within roughly 50 km.

Reviews

No reviews yet. Be the first to tell other drivers what to expect.

Anonymous review

Tell other drivers what happened at Hydepark: HydeOut ๐Ÿฝ๏ธ๐Ÿน.

No account. No email harvested. Captcha is used to keep spammers out.

By submitting you confirm this is your own experience. We rate-limit 1 review per IP per station per 24 hours.

Quick check-in

1 tap ยท rate-limited

Tell the next driver what to expect.

Photo

Add a photo of Hydepark: HydeOut ๐Ÿฝ๏ธ๐Ÿน.

JPEG, PNG, WebP or HEIC, 5 MB max. EXIF is stripped on our side. Photos appear after a quick moderation pass.

Drag a photo here, or click to pick one.

JPEG, PNG, WebP, HEIC up to 5 MB