chargevu
3 of 3 available300 kW peakEnBW (D)

Industriegebiet Süd A5 0

Industriegebiet Süd A5 0, Alzenau-Hörstein, DE

3 ports

Ports at this station

  • CCS2

    1× · up to 300 kW

    Available
  • CCS2

    1× · up to 300 kW

    Available
  • CHAdeMO

    1× · up to 300 kW

    Available

Station info

Address
Industriegebiet Süd A5 0, 63755, Alzenau-Hörstein, Germany
Coordinates
50.04758, 9.04716
Last verified
2021-07-12

About this stop

EnBW operates this ultra-rapid charging site in Alzenau-Hörstein. The station is designated Industriegebiet Süd A5 0 and offers CCS (Type 2) and CHAdeMO connectors. The number of charging points is not specified. The station is currently operational.

With a peak power of 300 kW, this is a capable stop for EV charging in Alzenau-Hörstein. For context, 300 kW can add approximately 200 miles of range to a compatible EV in about 15 minutes, depending on the vehicle's battery size and charging speed. This power level makes it suitable for quickly topping up during longer journeys or for local drivers needing a substantial charge.

Nearby

5 closest stations

If this site is busy or out of service, here are the next best options within roughly 50 km.

Reviews

No reviews yet. Be the first to tell other drivers what to expect.

Anonymous review

Tell other drivers what happened at Industriegebiet Süd A5 0.

No account. No email harvested. Captcha is used to keep spammers out.

By submitting you confirm this is your own experience. We rate-limit 1 review per IP per station per 24 hours.

Quick check-in

1 tap · rate-limited

Tell the next driver what to expect.

Photo

Add a photo of Industriegebiet Süd A5 0.

JPEG, PNG, WebP or HEIC, 5 MB max. EXIF is stripped on our side. Photos appear after a quick moderation pass.

Drag a photo here, or click to pick one.

JPEG, PNG, WebP, HEIC up to 5 MB