chargevu
4 of 4 available180 kW peakPowerGo

Jumbo 3762 Nieuwerkerk (PowerGo)

Polderweg 3, Nieuwerkerk, NL

4 ports

Ports at this station

  • CCS2

    1× · up to 180 kW

    Available
  • CCS2

    1× · up to 180 kW

    Available
  • CCS2

    1× · up to 180 kW

    Available
  • CCS2

    1× · up to 180 kW

    Available

Station info

Address
Polderweg 3, 4306 BV, Nieuwerkerk, Netherlands
Coordinates
51.64721, 3.99801
Last verified
2026-04-08

About this stop

This is an ultra-rapid EV charging station for drivers needing a quick charge. Located in Nieuwerkerk, NL, it is operated by PowerGo. The station offers 180 kW peak power and provides CCS (Type 2) connectors for your vehicle. EV charging in Nieuwerkerk is available here.

At 180 kW peak, this station is best suited for longer trips where you need to add substantial range quickly. For context, a 10% to 80% charge for a typical EV with a 60 kWh battery could take around 20 to 30 minutes. This station is likely part of your route for a fast top-up, not for overnight parking. The charging points are currently operational.

Nearby

6 closest stations

If this site is busy or out of service, here are the next best options within roughly 50 km.

Reviews

No reviews yet. Be the first to tell other drivers what to expect.

Anonymous review

Tell other drivers what happened at Jumbo 3762 Nieuwerkerk (PowerGo).

No account. No email harvested. Captcha is used to keep spammers out.

By submitting you confirm this is your own experience. We rate-limit 1 review per IP per station per 24 hours.

Quick check-in

1 tap · rate-limited

Tell the next driver what to expect.

Photo

Add a photo of Jumbo 3762 Nieuwerkerk (PowerGo).

JPEG, PNG, WebP or HEIC, 5 MB max. EXIF is stripped on our side. Photos appear after a quick moderation pass.

Drag a photo here, or click to pick one.

JPEG, PNG, WebP, HEIC up to 5 MB