KERRY FORD, INC BUICK GMC L3
150 Northland Blvd, Cincinnati, US
2 ports
Ports at this station
- Unknown
CHAdeMO
1× · up to 50 kW
- Unknown
CCS1
1× · up to 50 kW
Station info
- Address
- 150 Northland Blvd, 45246, Cincinnati, OH, United States
- Access
- 24 hours daily
- Phone
- 888-758-4389
- Website
- chargepoint.com
- Coordinates
- 39.28489, -84.47551
- Last verified
- 2025-11-11
About this stop
This ChargePoint station at KERRY FORD, INC BUICK GMC L3 in Cincinnati offers rapid charging for EVs. It has CCS (Type 1) connectors for cars like the Ford Mustang Mach-E, and CHAdeMO connectors for models such as the Nissan Leaf. The station is currently operational.
With a peak power of 50 kW, this station is suited for topping up your battery during local drives or longer journeys through Cincinnati. Expect to add about 100 miles of range to a compatible EV in one hour at this speed, though actual rates vary by vehicle and battery charge level.
6 closest stations
If this site is busy or out of service, here are the next best options within roughly 50 km.
No reviews yet. Be the first to tell other drivers what to expect.
Quick check-in
1 tap · rate-limited
Tell the next driver what to expect.
Add a photo of KERRY FORD, INC BUICK GMC L3.
JPEG, PNG, WebP or HEIC, 5 MB max. EXIF is stripped on our side. Photos appear after a quick moderation pass.
Drag a photo here, or click to pick one.
JPEG, PNG, WebP, HEIC up to 5 MB