chargevu
16 of 16 available62.5 kW peakChargePoint

MassPort TNC Lot (Ride App Staging Lot)

1 Harborside Drive, Boston, US

16 ports

Ports at this station

  • CHAdeMO

    6× · up to 62.5 kW

    Available
  • CCS1

    6× · up to 62.5 kW

    Available
  • Type 1 (J1772)

    4× · up to 6.48 kW

    Available

Station info

Address
1 Harborside Drive, 02128, Boston, MA, United States
Access
24 hours daily
Total points
8
Coordinates
42.37058, -71.02976
Last verified
2024-08-13

About this stop

ChargePoint operates the MassPort TNC Lot, a staging area for ride apps in Boston. Eight rapid chargers are available here. The site offers CCS (Type 1), CHAdeMO, and Type 1 (J1772) connectors. These chargers can reach a peak output of 63 kW.

This station is for quick EV charging in Boston. A 63 kW peak charge rate means adding about 200 miles of range to a compatible EV in an hour, assuming optimal conditions. It is best suited for drivers needing a significant charge rather than a full battery top-up. The station is currently operational.

Nearby

6 closest stations

If this site is busy or out of service, here are the next best options within roughly 50 km.

Reviews

No reviews yet. Be the first to tell other drivers what to expect.

Anonymous review

Tell other drivers what happened at MassPort TNC Lot (Ride App Staging Lot).

No account. No email harvested. Captcha is used to keep spammers out.

By submitting you confirm this is your own experience. We rate-limit 1 review per IP per station per 24 hours.

Quick check-in

1 tap · rate-limited

Tell the next driver what to expect.

Photo

Add a photo of MassPort TNC Lot (Ride App Staging Lot).

JPEG, PNG, WebP or HEIC, 5 MB max. EXIF is stripped on our side. Photos appear after a quick moderation pass.

Drag a photo here, or click to pick one.

JPEG, PNG, WebP, HEIC up to 5 MB