chargevu
0 of 2 available50 kW peakChargePoint

META MPK21.9-04 FC

2 Meta Wy MPK 21, Menlo Park, US

2 ports

Ports at this station

  • CCS1

    1× · up to 50 kW

    Unknown
  • NACS (Tesla)

    1× · up to 50 kW

    Unknown

Station info

Address
2 Meta Wy MPK 21, 94025, Menlo Park, CA, United States
Access
24 hours daily
Coordinates
37.48099, -122.16080
Last verified
2025-11-11

About this stop

This ChargePoint station in Menlo Park offers CCS (Type 1) and NACS connectors, suitable for most EVs. The META MPK21.9-04 FC operates at a peak power of 50 kW, categorized as rapid charging.

At 50 kW peak, expect to add about 20 miles of range per 10 minutes of charging, depending on your vehicle. This rate makes it a practical stop for topping up while running errands or for shorter road trips within the EV charging in Menlo Park network. The station is currently reported as operational.

Nearby

6 closest stations

If this site is busy or out of service, here are the next best options within roughly 50 km.

Reviews

No reviews yet. Be the first to tell other drivers what to expect.

Anonymous review

Tell other drivers what happened at META MPK21.9-04 FC.

No account. No email harvested. Captcha is used to keep spammers out.

By submitting you confirm this is your own experience. We rate-limit 1 review per IP per station per 24 hours.

Quick check-in

1 tap · rate-limited

Tell the next driver what to expect.

Photo

Add a photo of META MPK21.9-04 FC.

JPEG, PNG, WebP or HEIC, 5 MB max. EXIF is stripped on our side. Photos appear after a quick moderation pass.

Drag a photo here, or click to pick one.

JPEG, PNG, WebP, HEIC up to 5 MB