chargevu
2 of 2 available120 kW peakEDP

MGR*00016 Burger King

Av. Vitor Gallo 1 -, Marinha Grande, PT

2 ports

Ports at this station

  • CCS2

    1× · up to 120 kW

    Available
  • CHAdeMO

    1× · up to 60 kW

    Available

Station info

Address
Av. Vitor Gallo 1 -, Marinha Grande, Portugal
Total points
1
Coordinates
39.74717, -8.93345
Last verified
2025-01-21

About this stop

This location offers EV charging for cars using CCS (Type 2) and CHAdeMO connectors. One point is available at this EDP-operated site in Marinha Grande, Portugal.

At 120 kW peak, this rapid charger can add roughly 120 miles of range to a compatible EV in about 20 minutes. It is best suited for quick top-ups or as a road trip stop for drivers passing through. EV charging in Marinha Grande is available here for immediate use, as the station is reported as operational.

Nearby

5 closest stations

If this site is busy or out of service, here are the next best options within roughly 50 km.

Reviews

No reviews yet. Be the first to tell other drivers what to expect.

Anonymous review

Tell other drivers what happened at MGR*00016 Burger King.

No account. No email harvested. Captcha is used to keep spammers out.

By submitting you confirm this is your own experience. We rate-limit 1 review per IP per station per 24 hours.

Quick check-in

1 tap · rate-limited

Tell the next driver what to expect.

Photo

Add a photo of MGR*00016 Burger King.

JPEG, PNG, WebP or HEIC, 5 MB max. EXIF is stripped on our side. Photos appear after a quick moderation pass.

Drag a photo here, or click to pick one.

JPEG, PNG, WebP, HEIC up to 5 MB