chargevu
0 of 2 available50 kW peakeVgo Network

Miller Electric Company

6805 Southpoint Parkway, Jacksonville, US

2 ports

Ports at this station

  • CCS1

    2× · up to 50 kW

    Unknown

Station info

Address
6805 Southpoint Parkway, 32216, Jacksonville, FL, United States
Access
24 hours daily
Website
evgo.com
Coordinates
30.25910, -81.58967
Last verified
2025-11-11

About this stop

For drivers needing a rapid charge in Jacksonville, the Miller Electric Company station offers 50 kW peak power. This eVgo Network site provides CCS (Type 1) connectors. Its operational status means you can expect to find it ready for use.

A 50 kW peak charging speed typically adds about 100 miles of range to a compatible EV in under an hour, depending on the vehicle's battery and charge level. This makes it a practical choice for topping up while running errands or for shorter road trips where a longer stop isn't necessary. This station is part of the growing EV charging infrastructure in Jacksonville.

Nearby

6 closest stations

If this site is busy or out of service, here are the next best options within roughly 50 km.

Reviews

No reviews yet. Be the first to tell other drivers what to expect.

Anonymous review

Tell other drivers what happened at Miller Electric Company.

No account. No email harvested. Captcha is used to keep spammers out.

By submitting you confirm this is your own experience. We rate-limit 1 review per IP per station per 24 hours.

Quick check-in

1 tap · rate-limited

Tell the next driver what to expect.

Photo

Add a photo of Miller Electric Company.

JPEG, PNG, WebP or HEIC, 5 MB max. EXIF is stripped on our side. Photos appear after a quick moderation pass.

Drag a photo here, or click to pick one.

JPEG, PNG, WebP, HEIC up to 5 MB