chargevu
2 of 2 available50 kW peakIndependent

Murmästarvägen 1 - Allego

Murmästarvägen, Stockholm, SE

2 ports

Ports at this station

  • CHAdeMO

    1× · up to 50 kW

    Available
  • CCS2

    1× · up to 50 kW

    Available

Station info

Address
Murmästarvägen, 14172, Stockholm, Sweden
Total points
1
Coordinates
59.28652, 17.94082
Last verified
2023-10-04

About this stop

This independent EV charging site at Murmästarvägen 1 in Stockholm is operated by Allego. It offers one charging point with a peak power of 50 kW. The connectors available are CCS (Type 2) and CHAdeMO. The station is currently operational.

At 50 kW peak, this charger can add about 100 miles of range to a compatible EV in roughly 40 minutes, depending on the vehicle. It is best suited for a local top-up rather than a long road trip stop. Finding reliable EV charging in Stockholm can be a challenge, and this station provides a public option for drivers.

Nearby

6 closest stations

If this site is busy or out of service, here are the next best options within roughly 50 km.

Reviews

No reviews yet. Be the first to tell other drivers what to expect.

Anonymous review

Tell other drivers what happened at Murmästarvägen 1 - Allego.

No account. No email harvested. Captcha is used to keep spammers out.

By submitting you confirm this is your own experience. We rate-limit 1 review per IP per station per 24 hours.

Quick check-in

1 tap · rate-limited

Tell the next driver what to expect.

Photo

Add a photo of Murmästarvägen 1 - Allego.

JPEG, PNG, WebP or HEIC, 5 MB max. EXIF is stripped on our side. Photos appear after a quick moderation pass.

Drag a photo here, or click to pick one.

JPEG, PNG, WebP, HEIC up to 5 MB