Ports at this station
- Available
Schuko (CEE 7/4)
0× · up to 3.7 kW
- Available
Type 2
2× · up to 22 kW
- Available
CEE 3-pin
0× · up to 3.7 kW
- Available
CEE 5-pin
0× · up to 0 kW
- Available
CHAdeMO
0× · up to 0 kW
- Available
CCS2
0× · up to 0 kW
Station info
- Address
- Buckenhofer Straße 7, 91080, Spardorf, Germany
- Access
- Rund um die Uhr (24/7) nutzbar. Position: Neubaugebiet; neue Strasse heißt Kornblumenweg (noch nicht in Navi enthalten). Belegung kann in der RWE e-kWh App geprüft werden
- Total points
- 2
- Coordinates
- 49.60243, 11.05515
- Last verified
- 2015-12-29
About this stop
For drivers needing a steady charge, the Neubaugebiet station in Spardorf offers 22 kW AC power. N-ERGIE operates this site, which features two charging points. Connectors include CCS (Type 2), CHAdeMO, CEE 3 Pin, CEE 5 Pin, and Type 2 sockets. This station is operational and currently free to use.
This 22 kW peak output means slower AC charging. Expect to add roughly 40-60 miles of range per hour, depending on your vehicle. It is best suited for local top-ups or as a charging stop during shorter journeys within Spardorf, rather than for rapid DC fast charging on long road trips. The variety of connectors means most EVs can plug in, provided they have the correct cable for the CEE or Schuko outlets.
6 closest stations
If this site is busy or out of service, here are the next best options within roughly 50 km.
No reviews yet. Be the first to tell other drivers what to expect.
Quick check-in
1 tap · rate-limited
Tell the next driver what to expect.
Add a photo of Neubaugebiet.
JPEG, PNG, WebP or HEIC, 5 MB max. EXIF is stripped on our side. Photos appear after a quick moderation pass.
Drag a photo here, or click to pick one.
JPEG, PNG, WebP, HEIC up to 5 MB