PIE AE WEST LAKE DC3
701 S Capital of Texas Hwy, West Lake Hills, US
2 ports
Ports at this station
- Unknown
CHAdeMO
1× · up to 50 kW
- Unknown
CCS1
1× · up to 50 kW
Station info
- Address
- 701 S Capital of Texas Hwy, 78746, West Lake Hills, TX, United States
- Access
- 24 hours daily
- Phone
- 888-758-4389
- Website
- chargepoint.com
- Coordinates
- 30.29256, -97.82774
- Last verified
- 2025-11-11
About this stop
ChargePoint operates this EV charging site, PIE AE WEST LAKE DC3, in West Lake Hills, US. It provides rapid charging up to 50 kW. The station is equipped with both CCS (Type 1) and CHAdeMO connectors. This facility is part of the network for EV charging in West Lake Hills.
A 50 kW peak charging rate means you can add about 25 miles of range in an hour, depending on your vehicle. This rate is practical for topping up during local errands or for drivers needing a moderate range boost. The station's operational status indicates it is ready for use.
6 closest stations
If this site is busy or out of service, here are the next best options within roughly 50 km.
No reviews yet. Be the first to tell other drivers what to expect.
Quick check-in
1 tap · rate-limited
Tell the next driver what to expect.
Add a photo of PIE AE WEST LAKE DC3.
JPEG, PNG, WebP or HEIC, 5 MB max. EXIF is stripped on our side. Photos appear after a quick moderation pass.
Drag a photo here, or click to pick one.
JPEG, PNG, WebP, HEIC up to 5 MB