chargevu
2 of 2 operational60 kW peakPlenergy (ES)

Plenoil Torrejón de Ardoz II

Calle de Martin Luther King, Soto del Henares, ES

2 ports · 0,30€/kWh

Ports at this station

  • CCS2

    2× · up to 60 kW

    Operational

Station info

Address
Calle de Martin Luther King, Soto del Henares, 28859, Comunidad de Madrid, Spain
Total points
2
Coordinates
40.46527, -3.44224
Last verified
2024-11-01

How this site compares

In Spain

Top 21% by peak power

Among 20,601 sites with a known peak power

Plenergy (ES)

226 sites across 104 cities in Spain

All Plenergy (ES) sites in Spain →

50 kW+ within 25 km

461 other sites, 131 at 150 kW or more

Nearest: Hub Torrejón de Ardoz (Wenea) · 0.1 km · 360 kW · Wenea

Nearby

6 closest stations

If this site is busy or out of service, here are the next best options within roughly 50 km.

Reviews

No reviews yet. Be the first to tell other drivers what to expect.

Anonymous review

Tell other drivers what happened at Plenoil Torrejón de Ardoz II.

No account. No email harvested. Captcha is used to keep spammers out.

By submitting you confirm this is your own experience. We rate-limit 1 review per IP per station per 24 hours.

Quick check-in

1 tap · rate-limited

Tell the next driver what to expect.

Photo

Add a photo of Plenoil Torrejón de Ardoz II.

JPEG, PNG, WebP or HEIC, 5 MB max. EXIF is stripped on our side. Photos appear after a quick moderation pass.

Drag a photo here, or click to pick one.

JPEG, PNG, WebP, HEIC up to 5 MB