chargevu
2 of 2 available180 kW peakPLN (Indonesia)

PLN Distribusi Area Pamulang

PLN Distribusi Area Pamulang, , Jl Siliwangi, Tangerang Selatan, ID

2 ports · IDR 2467/kWh

Ports at this station

  • CCS2

    2× · up to 180 kW

    Available

Station info

Address
PLN Distribusi Area Pamulang, , Jl Siliwangi, 15416, Tangerang Selatan, Banten, Indonesia
Total points
1
Coordinates
-6.34453, 106.71888
Last verified
2026-04-08

About this stop

This ultra-rapid charging station is for drivers needing a fast charge. Located in Tangerang Selatan, ID, it's operated by PLN. One charging point offers a peak output of 180 kW, suitable for EVs that can accept it, using CCS (Type 2) connectors. This station is operational. The cost is IDR 2467 per kilowatt-hour.

With 180 kW peak power, you can add about 100 miles of range in roughly 15 to 20 minutes, depending on your vehicle's charging speed and battery level. This makes it a practical stop for EV charging in Tangerang Selatan if you need a substantial top-up rather than just a local charge. It's a good option for drivers needing more than a slow charge. Check your vehicle's maximum charging rate to understand its potential here.

Nearby

5 closest stations

If this site is busy or out of service, here are the next best options within roughly 50 km.

Reviews

No reviews yet. Be the first to tell other drivers what to expect.

Anonymous review

Tell other drivers what happened at PLN Distribusi Area Pamulang.

No account. No email harvested. Captcha is used to keep spammers out.

By submitting you confirm this is your own experience. We rate-limit 1 review per IP per station per 24 hours.

Quick check-in

1 tap · rate-limited

Tell the next driver what to expect.

Photo

Add a photo of PLN Distribusi Area Pamulang.

JPEG, PNG, WebP or HEIC, 5 MB max. EXIF is stripped on our side. Photos appear after a quick moderation pass.

Drag a photo here, or click to pick one.

JPEG, PNG, WebP, HEIC up to 5 MB